Ongoing
What the client
asked for.
A developer appointed us as project management consultant on a residential block being built by three separate contractors, after cost overruns on their previous project.
Scope of work
BOQ validation, tender re-evaluation, hold-point quality audits, running-bill certification, programme control and monthly cost reporting.
Challenges on this project
Our first measurement audit found that certified quantities in the substructure exceeded actual measured work by a material margin. We introduced joint measurement before every bill and a photographic record tied to each measurement sheet, which ended the discrepancy.
Outcome
Structure is at the eighth floor and tracking to the baseline programme. Certified cost is currently running under the revised budget.
Key materials and systems
- Ready-mix concrete, third-party cube tested
- Fe 550D reinforcement
- Aluminium formwork system
- AAC block masonry
Project summary
- Category: Commercial
- Location: Sector 82, Gurugram
- Built-up area: 86,000 sq.ft.
- Duration: 26 months (in progress)
- Year: 2026
- Status: Ongoing
Planning something similar?
Send us the plot details and we will tell you what is realistic on programme and budget — including if the answer is uncomfortable.
Discuss Your Project Explore our servicesThe project
in pictures.
More from
our portfolio.
Have a project in mind?
Let’s turn your idea into a space built to last. Talk to our team today.