Completed
What the client
asked for.
A clear-span storage facility with a 12-metre eaves height, four dock levellers, a mezzanine office block and an internal circulation road capable of taking 40-foot trailers.
Scope of work
Site development, foundations, pre-engineered building erection, flooring, dock equipment, office block and external infrastructure.
Challenges on this project
The soil investigation returned a low bearing capacity with a high water table in the north-west corner. Rather than deepen every footing, we redesigned that zone on a raft with ground improvement, which held the cost within budget. Separately, the 42,000 sq.ft. floor required an FM2-class flatness for the racking system, achieved with laser-screed placement in bays.
Outcome
Floor flatness verified to specification across the full slab. The facility was racked and operational three weeks after handover.
Key materials and systems
- Pre-engineered steel structure
- Laser-screed VDF flooring, FM2 class
- Insulated metal roof sheeting
- Hydraulic dock levellers
- Heavy-duty industrial paving
Project summary
- Category: Commercial
- Location: IMT Manesar, Haryana
- Built-up area: 42,000 sq.ft.
- Duration: 9 months
- Year: 2025
- Status: Completed
Planning something similar?
Send us the plot details and we will tell you what is realistic on programme and budget — including if the answer is uncomfortable.
Discuss Your Project Explore our servicesThe project
in pictures.
More from
our portfolio.
Have a project in mind?
Let’s turn your idea into a space built to last. Talk to our team today.