Completed
What the client
asked for.
Stilt-plus-four builder floors on a 200 sq.yd. plot, developed under a collaboration agreement with the landowner.
Scope of work
Feasibility, collaboration structuring, approvals, full construction and finishing.
Challenges on this project
Byelaw changes during the sanction period altered the permissible stilt height, requiring the ground-floor plinth to be re-detailed after excavation had begun.
Outcome
Delivered within the collaboration timeline with all four floors sold before completion.
Key materials and systems
- Fe 550D reinforcement
- UltraTech OPC 53
- Vitrified flooring
- UPVC windows
Project summary
- Category: Residential
- Location: Sector 65, Gurugram
- Built-up area: 7,400 sq.ft.
- Duration: 12 months
- Year: 2023
- Status: Completed
Planning something similar?
Send us the plot details and we will tell you what is realistic on programme and budget — including if the answer is uncomfortable.
Discuss Your Project Explore our servicesThe project
in pictures.
More from
our portfolio.
Have a project in mind?
Let’s turn your idea into a space built to last. Talk to our team today.